May 2017 - Escher was awarded a contract for the design and delivery of a flare system for the New Nasiriya Depot located in the Nasiriya field in Iraq.
The flare to be designed and delivered will be a flare stack and flare of total 20 meters height supported with guy-wires. The delivery of the flare is planned for end 2017.
Back to overview