Fuel & Seal Gas Unit Alba B3 Compression Platform

Fuel & Seal Gas Unit Alba B3 Compression Platform

On behalf of Iv-Oil & Gas and Heerema Fabrication Group, Escher Process Modules carried out the design work for the Fuel & Seal Gas Unit for the Alba B3 Compression Platform. This platform is currently in fabrication for Marathon Oil Company. The Alba B3 Compression Platform will be installed in the Alba field, located in the Gulf of Guinea offshore Equatorial Guinea.

The Fuel & Seal Gas Unit is designed to condition gas that is fed to the compressor on the compression platform. The unit capacity of the unit is 22 MMSCFD (24560 Nm3/hr), has a weight of 120 tonnes, a footprint of approximately 10 x 10 metres and a height of 12 metres.

Iv Company:
Iv-AGA
Market:
Buildings & Installations
Client:
Marathon Oil Company
Continent:
-- continent --
Country:
-- country --
Residence:
US (Gulf of Guinea) Offshore Alba Field

Fuel & Seal Gas Unit Alba B3 Compression Platform

 
 
Product: Oil & Gas Treatment Systems
End User: Marathon Oil Company
Area: Africa

On behalf of Iv-Oil & Gas and Heerema Fabrication Group, Escher Process Modules carried out the design work for the Fuel & Seal Gas Unit for the Alba B3 Compression Platform. This platform is currently in fabrication for Marathon Oil Company. The Alba B3 Compression Platform will be installed in the Alba field, located in the Gulf of Guinea offshore Equatorial Guinea.

The Fuel & Seal Gas Unit is designed to condition gas that is fed to the compressor on the compression platform. The unit capacity of the unit is 22 MMSCFD (24560 Nm3/hr), has a weight of 120 tonnes, a footprint of approximately 10 x 10 metres and a height of 12 metres.